Tel: +44 (0) 2079890750

Global Recruitment Experts

Access to millions of CV's and
thousands of international jobs

Civil Engineer for Civil and Marine seeks employment

I am currently available for work
Serial No: 53597
(10/17/1975, male)
List top 5 skills: civil marine works
Qualifications and Skills:

Overall Seventeen (17) years’ experience in Civil/Structure engineering, Infrastructure Construction for Oil and gas and heavy industries.

Profile: Civil Engineer – Construction Management and Supervision, planning , and estimating, project costing, Quality and Safety implementation, technical documents review, Technical beddings review, and develop work procedure, review drawings for construction and implement quality and safety procedure.

Civil and Marine Work
Oil and Gas Facility Maintenance Planning Engineer.
Oil and Gas Construction for Offshore.
PMT/ TPI service, EPC work and Construction for projects in Oil and gas Field.
Auto CAD, SAP, Microsoft Office (Word, Excel, PowerPoint), nPines, PPMS

Experience and responsibilities include the following:

• Construction management and supervision
• Co-ordination with the Client and the Contractor.
• Preparation of specifications and design basis.
• Development of Scope of works and specifications work procedure, construction schedule for construction.
• Review of Contractor’s/documents work procedure, construction schedule, Quality plan, approved materials, approved drawings for construction and other documents.
• Development and checking of Civil, Structural and Architectural Drawings.
• Development and Checking of Material Requisitions and Technical Bid Evaluations.
• Development and Checking of Bill of Quantities.
• Tender evaluation and recommendations.
• Checking vendor drawings and design calculations.
• Prepared Anchor Pattern for Construction Barge positioning for marine adviser approval.
• Offshore Construction supervison/ in-charge for constrcution of jetty, breakwater,revetment, quay wall installation, pipe protection installation and pipe laying and Trenching.
• Work experience using offshore equipemnt such as crane barge, cutter sunction dredger, deeper dredger.
• Worked experinced working with Divers using De-compression Chamber (DCC) & Scuba Replacement Package (SRP)

Previous Employment Details:

Employment/Career History:

Company: DNV-GL / Highland Marine Services
Position: Civil/ Structure Inspector for ADMA-OPCO ( PMT/ TPI)
Date: January 23, 2016 –up to present
Project name: ADMA-OPCO, SATAH AL RAZBOOT (SARB) Field Development Plant Facilities-Package-3, Zirku Island.

Overall Project Description: Onshore Pipeline Construction and Cable Laying .
Project Responsibilities:
• Performed the Quality Inspection and coordination, and provided all aspects of QA/QC system and implementation for the Construction of Onshore Pipeline Construction for onshore pipelines and cables from SARB Artificial Island and UMM – LULU to Northwest of Zirku Island.
• Inspected complete phases of civil construction, such as Excavation, pipe laying and backfilling of 48” Crude export line and Multiple Pipeline ( 8 lines for water injection, gas injection and crude oil ) from battery limit to process plant and tank farm respectively, Construction of Concrete Anchor Blocks and Excavation, sand bedding, cable laying, glanding, termination and backfilling of cables and vaults which include pre-commissioning of onshore section of the pipelines.
• Review and control all the accepted documentation like ITP, work procedure MS, Construction drawing, Materials submittal for approval, Site order and Technical query;
• Performed inspections for compliance to project standard codes and contracts documents, reviews contractors Quality plan and ITP, work procedures, materials approval.
• Review documentation methods and procedures for inspections, daily reports, identification and tracking of deficient and non-compliance work.
• Conduct surveillance report and inspection of work activities for compliance to requirements as specified on the design drawings, specification and supporting documents.
• Coordinate the required inspection and testing with the contractor and Subcontractor inspector.
• Review remedial or corrective action report proposed for non-conformance, approved release hold points delegated by Quality Manager;
• Prepare input weekly reports, audit schedule, surveillance schedule and changes to quality Plan;
• Conduct for a joint site inspection with the Contractor and Subcontractor as a client representative and TPI.
• Attend hold points, witness points as per ITP procedures;
• Coordinated with Client Construction Team Leader regarding plan deficiencies & code violations, performed by Contractor’s and their sub-contractors.
• Attend meeting with the contractor’s and sub-contractors regarding quality and safety issues at site.

Company: DNV-GL / Highland Marine Services
Position: Barge Client Representative for ADMA-OPCO (PMT)
Date: 15 July 2014 – January 23, 2016
Project name: ADMA-OPCO, SATAH AL RAZBOOT (SARB) Field Development Plant Facilities-Package-3, Zirku Island.
Overall Project Description: Construction of three kilometers of onshore pipelines and 55km of subsea power and communication cables.
Project Responsibilities:
• Shore Pulling Activties from Trench A (8 Pipe Lines) & Trench B (1 Pipe Line), 580 m. & 540 m. respectively which include construction of temporary jetty, trenching using Cutter Suction Dredger, earth moving equipment (EME) for Shore Pull preparation including back hold pipes installation, winch anchor placing and onshore anchor installation. Shore Pull using Direct Laying Barge 1600(DLB 1600) for Pipe Layin
• Monitoring of daily activities and checking/ approval of contractor reports.
• Verify drawings and other technical information submitted by the contractor for approval.
• Response for any Interface problem encounter in the site.
• Check and evaluate the site work condition.
• Daily reporting and inspection on work progress;
• Conducting daily progress and safety meeting.


Company: Hyundai Heavy Industries ( Kingdom of Saudi Arabia )
Position: Senior Civil Engineer ( Civil and Marine Works )
Date: 13 Oct. 2013 – 11 July 2014
Project name: South Jeddah Thermal Power Plant – SEC Jeddah KSA – EPC
Overall Project Description: The Jeddah South facility will be Saudi Arabia’s largest thermal power plant and will feature four 660-MW steam turbines, which will give it the capability to produce 2,640 MW of electricity.
Project Responsibilities:
• Supervision and plan execution for Dredging/ Trenching, Break Water Construction, Slope Protection and Core LOC Installation
• Responsible for project implementation and direct supervision.
• Review construction procedures/Method statements and other quality documents, conduct surveillance and non-conformances;
• Prepare Work and Material Schedule.
• Prepare Daily Work Activities and Weather / Marine Vessel Report & Anchor Pattern.
• Review Plans and Prepare Shop Drawings/ As Built Plans.
• Updating Revised Drawing and Bill of Quantity
• Worked with Offshore Crane, Dipper/ Cutter Dredger and Marine Material Barge.
• Worked with Divers using De-compression Chamber (DCC) & Scuba Replacement Package (SRP).

Company: Hyundai Heavy Industries ( Abu Dhabi, UAE )
Position: Civil Engineer ( Civil and Marine Works )
Date: 5 Oct. 2010 – 10 Oct. 2013
Project name: Integrated Gas Development Project / Engineering, Procurement & Construction Project - ADGAS
Overall Project Description: IGD facilities will be built on reclaimed land due to the limited land availability at Das Island. Additionally a construction jetty will be built at the end of the process site which will be utilized for offloading the large plant modules.
Project Responsibilities:
• Direct supervision and strict implementation for subcontractor works for Dredging (Trenching), Shore Protection, Quay Walls (PC Blocks), Core LOC Installation, Breakwater, Revetments, Embankment, Breakwater, Shoreline Protection and Temporary Jetty.
• Responsible for project implementation and direct supervision.
• Review construction procedures/Method statements and other quality documents, conduct surveillance and non-conformances;
• Prepare Work and Material Schedule.
• Prepare Daily Work Activities and Weather / Marine Vessel Report & Anchor Pattern.
• Review Plans and Prepare Shop Drawings/ As Built Plans.
• Updating Revised Drawing and Bill of Quantity.
• Worked with Offshore Crane, Dipper Dredger & Spud Barge
• Worked with Divers using De-compression Chamber (DCC) & Scuba Replacement Package (SRP).

Company: Hyundai Heavy Industries ( Riffa, Bahrain )
Date: 31 Mar. 2009 – 23 Aug. 2010
Position: Civil Planning Engineer
Project name: Independent Water Power Plant – EPC Project –Al Dur IWPP
Overall Project Description: The plant consists of a Combined Cycle Gas Turbine power plant and a Reverse Osmosis (RO) technology desalination plant together with all support facilities such as seawater intake and discharge structures and gas connection facilities. The IWPP will have a capacity of 1,234 MW of power and 218,200 cubic meters per day.
Project Responsibilities:
• Responsible for preparing engineering package such as scope of work and specifications, plans/drawings, estimates, and schedules.
• Prepare work schedules and updates schedule on daily bases.
• Prepare 3 weeks ahead schedule for site activities incorporated in master plan schedule, milestone;
• Calculate the progress accomplishment for monthly billing of contractors claim;
• Check and evaluate every monthly payments and claims of subcontractors progress payment
• Responsible for updating the materials status and expediting delivery of materials.
• Conduct inspection on material deliveries for consistency with the required material specifications.
• Assist in the final project inspection and punch listing before project completion.
• Initiate project start-up and mobilization by subcontractor based on the availability of materials and pre-designed schedule

Company: Saudi Arabian Oil Company (Kingdom of Saudi Arabia)
Date: 22 Jan. 2007 – 28 Feb. 2009
Position: Civil Planning Engineer for Maintenance
Project name: Saudi Aramco
Overall Project Description: Saudi Aramco Yanbu Low Security Plant Maintenance and special projects.
Project Responsibilities:
• Responsible for preparing engineering package (scope of work and specifications, plans/drawings, budgetary estimates, and schedules) and material control.
• Prepare contractors or vendors contract notes in conjunction with the detailed scope of work, specifications, and drawings. This includes construction notes, material notes, procedure notes, safety notes, time-keeping notes, and other notations deem necessary for the proper project execution
• Check and evaluate every monthly payments and claims of subcontractors progress payment
• Responsible for updating the materials status and expediting delivery of materials.
• Conduct inspection on material deliveries for consistency with the required material specifications.
• Assist in the final project inspection and punch listing before project completion.
• Initiate project start-up and mobilization by subcontractor based on the availability of materials and pre-designed schedule.
• Acts as technical adviser and evaluate issues for facilities maintenance concerning civil works.
• SAP/R3 Software in PM mode, Auto CAD. Microsoft project, word, excel, and outlook

Company: New Gold Band Construction Realty and Developer Corp. Cavite, Philippines
Date:1 Aug. 2005 – 17 Jan. 2007
Position: Project Engineer / Supervisor
Overall Project Description: Building construction and reality development
Project Responsibilities:
• Responsible for preparing engineering plans, estimates and schedule for building construction under strict and direct supervision.
• Prepare in house and subcontractors engineering plans, estimates, and schedules.
• Direct implementation and supervision for building construction under UBC
• Check and evaluate every monthly payments and claims of subcontractor’s progress payment.
• Established and maintain professional relationship with client, associate and field employees.
• Auto CAD ,Microsoft Word, Excel, and Outlook

Company: Philippine Eco Panel Inc. Cavite, Philippines
Date:1 Oct. 2003 – 30 Jul. 2005
Position: Production Quality Controller ( QA/QC) / Supervisor
Overall Project Description: Production of Pre cast concrete product foe walls using Germany advance technology.
Project Responsibilities:
• Responsible for quality control and estimations of Wall Panel & Pre –Cast Foundation.
• Estimates Bill of Quantity
• Inspect and coordinate off-site pre-cast fabrication yard, effort for efficiency and adherence to construction design and details;
• Review and comments on contractors Quality Plan, ITP procedure, inspection checklist, construction drawing and work procedure
• Supervision of Worker Output.
• Prepare Work Plan/ Schedule for the production.
• Check and Control Material production.

Company: JTC Engineering Services Baguio City, Philippines
Date:1 Jun. 2000 – 15 Sept. 2003
Position: Construction Engineer
Project Name:
Overall Project Description: Building Construction and Housing
Project Responsibilities:
• Responsible for preparing engineering plans, estimates and schedule for building construction under strict and direct supervision.
• Review drawings for construction, materials take-off, estimate and specification of assigned project. And direct control of work supervision, materials delivery and conduct inspection at site for the identification, and conformance to specification of Government requirements, take samples of materials testing done at laboratories, perform test on soils, and concrete, re-bars for tensioning and elongation;
• Prepare engineering plans, estimates, and schedules.
• Direct implementation and supervision for building construction under UBC
• Initiating inspection for every schedule activities.
• Establish and maintain professional relationship with client, associate and field employees.

Company: Sta. Lucia Realty & Development Inc. Baguio City, Philippines.
Date:1 Apr. 1998 – 31 Mar. 2000
Position: Cadet/ Field Engineer
Project Name: Pinewood Golf and Country Club Estates
Overall Project Description: Land Development and Earth Works.
Project Responsibilities:
• Assisted the project engineer in the preparation of construction drawings and calculation of earthwork volume setting location and elevation of form work box culverts and bridges.
• Assisting Project Engineer for implementation.
• Earthworks cut to fill, imported fill and sub-grade including survey checking and testing.
• Drainage, including excavation, installation, back fill and protection of reinforced concrete pipes and box culverts, pre-cast concrete structures, in-situ concrete structures, kerb and channel, open drains
• Prepared Schedules, Estimates and Bill of Quantity.
• Prepared Shop Drawings
• Updates Plans and Drawings

Current location: 

Abu Dhabi, United Arab Emirates - View on map

Nationality: 

Filipino

Preferred Sector of Employment: 

Oil, Gas and Energy

Spoken languages: 

english

Locations I am interested in working:

Anywhere